On April 24, 2019, at Hutchison Ports Thailand’s Terminal D, the first lot of three train cars for the MRT Blue Line were discharged from the M.V. ONE GRUS.


On April 24, 2019, at Hutchison Ports Thailand’s Terminal D, the first lot of three train cars for the MRT Blue Line were discharged from the M.V. ONE GRUS. The three train cars were discharged by ship-to-shore cranes equipped with special handling equipment with expert operators, while another three ship-to-shore cranes were operated by Terminal D’s new remote control system. The train car's dimensions measure 3.1 meters wide, 21.8 meters long and weighs of 37.7 metric tonnes. The three train cars were successfully discharged to low base trucks safely and accurately.







Comments