AS THE CORONAVIRUS (COVID-19) INCREASES THE WORK CONTINUES TO REINSTATE THE BEACH AT LANDGUARD POINT AT FELIXSTOWE.
19th MARCH 2020
FELIXSTOWE,SUFFOLK,UK.
RIVER ORWELL
ALL PICTURE CREDITS TO :-
ADRIAN WIGG
AS THE CORONAVIRUS (COVID-19) INCREASES THE WORK CONTINUES TO REINSTATE THE BEACH AT LANDGUARD POINT AT FELIXSTOWE.
THIS WORK TAKES PLACE NOMINALLY EACH YEAR DEPENDING ON WEATHER AND TIDAL ACTIONS THROUGHOUT THE PRECEEDING YEAR.
ACCORDING TO THE WORKFORCE SOME 40000 TONNES OF BEACH ARE REINSTATED DURING THE PROCESS.
Robot RTG'S all standing to attention
19th MARCH 2020
PORT OF FELIXSTOWE,SUFFOLK,UK.
PICTURE CREDIT - ADRIAN WIGG
(09.33 LT)
OUTBOUND ON THE RIVER ORWELL
IMO - 9502867
TEU - 13092
"MAERSK EDIRNE"
BUILT 2012
BY :- HYUNDAI HEAVY INDUSTRIES, ULSAN, SOUTH KOREA.
LENGTH / BEAM - 366mts x 48mts
GT - 141754
FLAG - SINGAPORE
CALLSIGN - 9V6463
CURRENT DRAUGHT - 12.50mts
LAST PORT OF CALL - COLOMBO NEXT ROTTERDAM
PORT OF FELIXSTOWE,SUFFOLK,UK.
PICTURE CREDIT - ADRIAN WIGG
(09.33 LT)
OUTBOUND ON THE RIVER ORWELL
IMO - 9502867
TEU - 13092
"MAERSK EDIRNE"
BUILT 2012
BY :- HYUNDAI HEAVY INDUSTRIES, ULSAN, SOUTH KOREA.
LENGTH / BEAM - 366mts x 48mts
GT - 141754
FLAG - SINGAPORE
CALLSIGN - 9V6463
CURRENT DRAUGHT - 12.50mts
LAST PORT OF CALL - COLOMBO NEXT ROTTERDAM
Ships in Photographs & Videos from Felixstowe, Harwich, Ipswich and Mistley
Comments
Post a Comment