Skip to main content

Sajir sailing from Felixstowe after Maiden Call


15,000 TEU UASC Sajir sails from the Port of Felixstowe on the cold and breezy afternoon of 24th January, 2015. This vessel is said be LNG-ready, but does not have LNG tanks fitted yet.
The ship’s departure was delayed for several minutes due to a loss of main engine power, and a loss of power to the winches.



Shipping TV

Comments