15,000 TEU UASC Sajir sails from the Port of Felixstowe on the cold and breezy afternoon of 24th January, 2015. This vessel is said be LNG-ready, but does not have LNG tanks fitted yet.
The ship’s departure was delayed for several minutes due to a loss of main engine power, and a loss of power to the winches.
The ship’s departure was delayed for several minutes due to a loss of main engine power, and a loss of power to the winches.
Comments
Post a Comment